| Substrate temperature | Installation time | Initial setting time | Curing time |
|---|---|---|---|
| -5°C~0°C | 5h | 30h | 96h |
| 0°C~10°C | 4h | 22h | 72h |
| 10°C~20°C | 2h | 14h | 48h |
| 20°C~30°C | 45min | 9h | 24h |
| 30°C~40°C | 30min | 4h | 12h |
| Chemical screw model | Drilling diameter (mm) | Drilling depth (mm) | Number of holes available per glue stick |
|---|---|---|---|
| M8 | 10 | 80 | 101 |
| M10 | 12 | 90 | 62 |
| M12 | 14 | 110 | 37 |
| M16 | 18 | 125 | 20 |
| M20 | 25 | 170 | 10 |
| M24 | 28 | 210 | 7 |
| M30 | 35 | 280 | 3 |