Substrate temperature | Installation time | Initial setting time | Curing time |
---|---|---|---|
-5°C~0°C | 5h | 30h | 96h |
0°C~10°C | 4h | 22h | 72h |
10°C~20°C | 2h | 14h | 48h |
20°C~30°C | 45min | 9h | 24h |
30°C~40°C | 30min | 4h | 12h |
Chemical screw model | Drilling diameter (mm) | Drilling depth (mm) | Number of holes available per glue stick |
---|---|---|---|
M8 | 10 | 80 | 101 |
M10 | 12 | 90 | 62 |
M12 | 14 | 110 | 37 |
M16 | 18 | 125 | 20 |
M20 | 25 | 170 | 10 |
M24 | 28 | 210 | 7 |
M30 | 35 | 280 | 3 |